12m Power Cable For Flymo Hover Stripe RXE300 Lawnmower Extra Long Lead Plug
Availability: In stock
12 Metre Power Cable For Flymo Hover Stripe RXE300 Lawnmower
Brand new high-quality compatible replacement mains cable & plug for your Flymo garden appliances.
Specification: 12 metres, 2 core, 1.00mm flex, BS1363/A Certified
Please Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.
Fits models:
FLYMO
Flymo Hover Stripe RXE300 Lawnmower
**Important notice: Appliance repairs must always be carried out by a suitably qualified engineer or technician.**
**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.