Skip to content

12m Power Cable For Flymo Hover Vac 280 Lawnmower Extra Long Lead with Plug

£16.39
**Free Tracked Shipping**

12 Metre Power Cable For Flymo Hover Vac 280 Lawnmower

Brand new high-quality compatible replacement mains cable & plug for your Flymo garden appliances.

Specification: 12 metres, 2 core, 1.00mm flex, BS1363/A Certified

Please Note: This Item Is ONLY For Use With FLYMO Electric Outdoor Products which require a hard wire 2 core cable.

Fits models:

FLYMO

Flymo Hover Vac 280 Lawnmower

**Important notice:  Appliance repairs must always be carried out by a suitably qualified engineer or technician.**

**Please note: this cable is designed for mowers with hard-wired cables. Please check that your mower has a cable that matches the specification above. This product is not manufactured by Flymo, but it is designed to be compatible with Flymo machines. The Flymo name, model names and any part numbers have been used for reference purposes only and are in no way associated with the original manufacturer.


Order Placed

Jul 07

After you place the order, we will need to 1 day to prepare the shipment

Order Dispatched

Jul 08

Order will start to be shipped.

Delivered

Jul 09

Estimate arrival date: Jul 08 - Jul 09

Order in the next 12 Hours 19 Minutes 49 Seconds for delivery by Jul 09 if DPD 1 Day (Fastest)** shipping is selected.

 

 

**1 day excludes delivery on weekends and public holidays.**

 

 More payment options

QUANTITY DISCOUNT (must checkout from basket)

BuySave
2 or more2% off
3 or more3% off
4 or more4% off
5 or more5% off

Customer Reviews

Based on 2 reviews
100%
(2)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
M
Martin Blackburn
Replacement cable

As described prompt delivery

J
J Mitchell
Quick delivery.

Can’t fault the product. Worked perfectly with a quick delivery.